Supported Boards and Shields

This page lists all the boards and shields that are currently supported in Zephyr.

If you are looking to add Zephyr support for a new board, please start with the Board Porting Guide. When adding support documentation for a board, remember to use the template available under doc/templates/board.tmpl.

Shields are hardware add-ons that can be stacked on top of a board to add extra functionality. Refer to the Shield porting and configuration for more information on how to port a shield.

aconno GmbH
acn52832
arm
Advanced Micro Devices (AMD), Inc.
ACP 6.0 Xtensa Audio DSP
Project ACRN
A picture of the ACRN hypervisor board
ACRN hypervisor
x86
Project ACRN
A picture of the ACRN Hypervisor on ADL board
ACRN Hypervisor on ADL
x86
Project ACRN
A picture of the ACRN on EHL hypervisor board
ACRN on EHL hypervisor
x86
Analog Devices, Inc.
A picture of the AD-APARD32690-SL board
AD-APARD32690-SL
arm
Analog Devices, Inc.
A picture of the AD-SWIOT1L-SL board
AD-SWIOT1L-SL
arm
Adafruit Industries, LLC
A picture of the Adafruit ESP32-S3 Reverse TFT Feather board
Adafruit ESP32-S3 Reverse TFT Feather
xtensa
Adafruit Industries, LLC
A picture of the Adafruit Feather ESP32S2 board
Adafruit Feather ESP32S2
xtensa
Adafruit Industries, LLC
A picture of the Adafruit Feather ESP32S2 TFT board
Adafruit Feather ESP32S2 TFT
xtensa
Adafruit Industries, LLC
A picture of the Adafruit Feather ESP32S2 TFT Reverse board
Adafruit Feather ESP32S2 TFT Reverse
xtensa
Adafruit Industries, LLC
A picture of the Adafruit Feather ESP32S3 board
Adafruit Feather ESP32S3
xtensa
Adafruit Industries, LLC
A picture of the Adafruit Feather ESP32S3 TFT board
Adafruit Feather ESP32S3 TFT
xtensa
Adafruit Industries, LLC
A picture of the Adafruit MacroPad RP2040 board
Adafruit MacroPad RP2040
arm
Andes Technology Corporation
A picture of the ADP-XC7K AE350 board
ADP-XC7K AE350
riscv
Contextual Electronics
A picture of the Advanced BLE Cell board
Advanced BLE Cell
arm
96Boards
A picture of the Aerocore2 board
Aerocore2
arm
Intel Corporation
Agilex SoC Development Kit
arm64
Intel Corporation
Agilex™ 5 SoC FPGA Development Kit
arm64
Ai-Thinker Co., Ltd.
A picture of the Ai-Thinker WB2-12F development board board
Ai-Thinker WB2-12F development board
riscv
Intel Corporation
Alder Lake CRB
x86
Intel Corporation
Alder Lake RVP
x86
Raytac Corporation
A picture of the AN54L15Q-DB board
AN54L15Q-DB
arm, riscv
Raytac Corporation
A picture of the AN7002Q-DB-5340 board
AN7002Q-DB-5340
arm
Ambiq Micro, Inc.
A picture of the Apollo3 Blue EVB board
Apollo3 Blue EVB
arm
Ambiq Micro, Inc.
A picture of the Apollo3 Blue Plus EVB board
Apollo3 Blue Plus EVB
arm
Ambiq Micro, Inc.
A picture of the Apollo4 Blue Plus KXR EVB board
Apollo4 Blue Plus KXR EVB
arm
Ambiq Micro, Inc.
A picture of the Apollo4P EVB board
Apollo4P EVB
arm
Ambiq Micro, Inc.
A picture of the Apollo510 SOC Evaluation Board board
Apollo510 SOC Evaluation Board
arm
Synopsys, Inc.
A picture of the ARC EM Software Development Platform board
ARC EM Software Development Platform
arc
Synopsys, Inc.
A picture of the ARC EM Starter Kit board
ARC EM Starter Kit
arc
Synopsys, Inc.
A picture of the ARC HS Development Kit board
ARC HS Development Kit
arc
Synopsys, Inc.
A picture of the ARC HS4x/HS4xD Development Kit board
ARC HS4x/HS4xD Development Kit
arc
Synopsys, Inc.
A picture of the ARC IoT Development Kit board
ARC IoT Development Kit
arc
Synopsys, Inc.
ARC nSIM and HAPS FPGA boards
arc
Arduino
A picture of the Arduino Due board
Arduino Due
arm
Arduino
A picture of the Arduino GIGA R1 WiFi board
Arduino GIGA R1 WiFi
arm
Arduino
A picture of the Arduino MKR Zero board
Arduino MKR Zero
arm
Arduino
A picture of the Arduino Nano 33 BLE (Sense) board
Arduino Nano 33 BLE (Sense)
arm
Arduino
A picture of the Arduino Nano 33 IOT board
Arduino Nano 33 IOT
arm
Arduino
A picture of the Arduino Nano Matter board
Arduino Nano Matter
arm
Arduino
A picture of the Arduino Nicla Sense ME board
Arduino Nicla Sense ME
arm
Arduino
A picture of the Arduino Nicla Vision board
Arduino Nicla Vision
arm
Arduino
A picture of the Arduino OPTA board
Arduino OPTA
arm
Arduino
A picture of the Arduino Portenta C33 board
Arduino Portenta C33
arm
Arduino
A picture of the Arduino Portenta H7 board
Arduino Portenta H7
arm
Arduino
A picture of the Arduino UNO R4 Minima/WiFi board
Arduino UNO R4 Minima/WiFi
arm
Arduino
A picture of the Arduino/Genuino Zero board
Arduino/Genuino Zero
arm
Particle.io
A picture of the Argon board
Argon
arm
96Boards
A picture of the Argonkey board
Argonkey
arm
Xen Hypervisor
ARMv8 Xen Virtual Machine Example
arm64
Shanghai Ruiside Electronic Technology Co., Ltd.
A picture of the ART-Pi2 board
ART-Pi2
arm
Other/Unknown
A picture of the Arturo182 Serpente board
Arturo182 Serpente
arm
Digilent, Inc.
A picture of the Arty board
Arty
arm
ASPEED Technology Inc.
A picture of the AST1030_EVB board
AST1030_EVB
arm
M5Stack
A picture of the ATOM Lite board
ATOM Lite
xtensa
M5Stack
A picture of the AtomS3 board
AtomS3
xtensa
M5Stack
A picture of the AtomS3 Lite board
AtomS3 Lite
xtensa
96Boards
A picture of the Avenger96 board
Avenger96
arm
Shanghai MXCHIP Information Technology Co., Ltd.
A picture of the AZ3166 MXChip IoT DevKit board
AZ3166 MXChip IoT DevKit
arm
STMicroelectronics
A picture of the B-G474E-DPOW1 Discovery board
B-G474E-DPOW1 Discovery
arm
STMicroelectronics
A picture of the B-L072Z-LRWAN1 Discovery kit board
B-L072Z-LRWAN1 Discovery kit
arm
STMicroelectronics
A picture of the B-L4S5I-IOT01A Discovery kit board
B-L4S5I-IOT01A Discovery kit
arm
STMicroelectronics
A picture of the B-U585I-IOT02A Discovery kit board
B-U585I-IOT02A Discovery kit
arm
Intel Corporation
Bartlett Lake P CRB
x86
ARM Ltd.
BASE RevC AEMv8A Fixed Virtual Platforms
arm64
Broadcom Corporation
BCM958401M2
arm
Broadcom Corporation
BCM958402M2 (Cortex-M7)
arm, arm64
BeagleBoard.org Foundation
A picture of the BeagleBone AI-64 board
BeagleBone AI-64
arm
BeagleBoard.org Foundation
A picture of the BeagleConnect Freedom board
BeagleConnect Freedom
arm
BeagleBoard.org Foundation
A picture of the BeaglePlay (CC1352) board
BeaglePlay (CC1352)
arm
BeagleBoard.org Foundation
A picture of the BeagleV®-Fire board
BeagleV®-Fire
riscv
BeagleBoard.org Foundation
A picture of the BeagleY-AI board
BeagleY-AI
arm
Ezurio
A picture of the BL5340 DVK board
BL5340 DVK
arm
Ezurio
A picture of the BL54L15 DVK board
BL54L15 DVK
arm, riscv
Ezurio
A picture of the BL54L15u DVK board
BL54L15u DVK
arm, riscv
Bouffalo Lab (Nanjing) Co., Ltd.
A picture of the BL604E IOT DVK development board board
BL604E IOT DVK development board
riscv
Ezurio
A picture of the BL652 DVK board
BL652 DVK
arm
Ezurio
A picture of the BL653 DVK board
BL653 DVK
arm
Ezurio
A picture of the BL654 DVK board
BL654 DVK
arm
Ezurio
A picture of the BL654 Sensor Board board
BL654 Sensor Board
arm
Ezurio
A picture of the BL654 USB (451-00004) board
BL654 USB (451-00004)
arm
WeAct Studio
A picture of the Black Pill V1.2 board
Black Pill V1.2
arm
WeAct Studio
A picture of the Black Pill V2.0 board
Black Pill V2.0
arm
WeAct Studio
A picture of the Black Pill V3.0 board
Black Pill V3.0
arm
Other/Unknown
A picture of the Black STM32 F407VE Development Board board
Black STM32 F407VE Development Board
arm
Other/Unknown
A picture of the Black STM32 F407ZG Pro Development Board board
Black STM32 F407ZG Pro Development Board
arm
Waveshare Electronics
A picture of the BLE400 board
BLE400
arm
Blue Clover Devices
A picture of the Blue Clover PLT Demo V2 nRF52832 board
Blue Clover PLT Demo V2 nRF52832
arm
WeAct Studio
A picture of the BluePill Plus CH32V203 board
BluePill Plus CH32V203
riscv
Particle.io
A picture of the Boron board
Boron
arm
bytesatwork AG
A picture of the byteSENSI-L board
byteSENSI-L
arm
Other/Unknown
A picture of the CANbardo board
CANbardo
arm
Other/Unknown
A picture of the candleLight board
candleLight
arm
Other/Unknown
A picture of the candleLightFD board
candleLightFD
arm
96Boards
A picture of the Carbon board
Carbon
arm
Texas Instruments
A picture of the CC1352P1 LaunchXL board
CC1352P1 LaunchXL
arm
Texas Instruments
A picture of the CC1352P7 LaunchPad board
CC1352P7 LaunchPad
arm
Texas Instruments
A picture of the CC1352R SensorTag board
CC1352R SensorTag
arm
Texas Instruments
A picture of the CC1352R1 LaunchXL board
CC1352R1 LaunchXL
arm
Texas Instruments
A picture of the CC2340R5 LaunchPad board
CC2340R5 LaunchPad
arm
Texas Instruments
A picture of the CC26x2R1 LaunchXL board
CC26x2R1 LaunchXL
arm
Texas Instruments
CC3220SF LaunchXL
arm
Texas Instruments
CC3235SF LaunchXL
arm
MikroElektronika d.o.o.
A picture of the Clicker 2 for STM32 board
Clicker 2 for STM32
arm
MikroElektronika d.o.o.
A picture of the Clicker RA4M1 board
Clicker RA4M1
arm
M5Stack
A picture of the Core2 board
Core2
xtensa
M5Stack
A picture of the CoreS3 board
CoreS3
xtensa
SEGGER Microcontroller GmbH
A picture of the Cortex-M Trace Reference Board V1.2 board
Cortex-M Trace Reference Board V1.2
arm
Antmicro's open source simulation and virtual development framework
Cortex-R8 Virtual
arm
CTHINGS.CO
A picture of the CTHINGS.CO Connectivity Card board
CTHINGS.CO Connectivity Card
arm
OpenHW Group
A picture of the cv32a6_genesys_2 board
cv32a6_genesys_2
riscv
OpenHW Group
A picture of the cv64a6_genesys_2 board
cv64a6_genesys_2
riscv
Croxel, Inc.
A picture of the CX1825 nRF52840 board
CX1825 nRF52840
arm
Infineon Technologies
A picture of the CY8CPROTO-062-4343W board
CY8CPROTO-062-4343W
arm
Infineon Technologies
A picture of the CY8CPROTO-063-BLE board
CY8CPROTO-063-BLE
arm
Intel Corporation
A picture of the Cyclone® V SoC Development Kit board
Cyclone® V SoC Development Kit
arm
Blues Wireless
A picture of the Cygnet board
Cygnet
arm
Infineon Technologies
A picture of the CYW920829M2EVK-02 board
CYW920829M2EVK-02
arm
Renesas Electronics Corporation
A picture of the DA14695 Development Kit USB board
DA14695 Development Kit USB
arm
Renesas Electronics Corporation
A picture of the DA1469x Development Kit Pro board
DA1469x Development Kit Pro
arm
Variscite Ltd.
A picture of the DART-MX8M-PLUS board
DART-MX8M-PLUS
arm, arm64
Variscite Ltd.
A picture of the DART-MX93 board
DART-MX93
arm, arm64
ARM Ltd.
A picture of the Debug with Arm DS board
Debug with Arm DS
arm, arm64
Qorvo, Inc.
Decawave DWM1001
arm
Qorvo, Inc.
Decawave DWM3001CDK
arm
Atmark Techno, Inc.
A picture of the Degu Evaluation Kit board
Degu Evaluation Kit
arm
STMicroelectronics
A picture of the Disco L475 IOT01 (B-L475E-IOT01A) board
Disco L475 IOT01 (B-L475E-IOT01A)
arm
Google, Inc.
Dragonclaw Development Board
arm
Doctors of Intelligence & Technology
A picture of the DT-BL10 coexistence Module Development Kit board
DT-BL10 coexistence Module Development Kit
riscv
Chengdu Ebyte Electronic Technology
A picture of the E73-TBB board
E73-TBB
arm
Khadas
Edge-V
arm64
Khadas
A picture of the Edge2 board
Edge2
arm64
Silicon Laboratories
A picture of the EFM32 Giant Gecko 11 (SLSTK3701A) board
EFM32 Giant Gecko 11 (SLSTK3701A)
arm
Silicon Laboratories
A picture of the EFM32 Happy Gecko (SLSTK3400A) board
EFM32 Happy Gecko (SLSTK3400A)
arm
Silicon Laboratories
A picture of the EFM32 Pearl Gecko (SLSTK3401A) board
EFM32 Pearl Gecko (SLSTK3401A)
arm
Silicon Laboratories
A picture of the EFM32 Pearl Gecko 12 (SLSTK3402A) board
EFM32 Pearl Gecko 12 (SLSTK3402A)
arm
Silicon Laboratories
A picture of the EFM32 Wonder Gecko (EFM32WG-STK3800) board
EFM32 Wonder Gecko (EFM32WG-STK3800)
arm
Silicon Laboratories
A picture of the EFM32GG12 Thunderboard (SLTB009A) board
EFM32GG12 Thunderboard (SLTB009A)
arm
Silicon Laboratories
A picture of the EFR32BG13 2.4 GHz 10 dBm (SLWRB4104A) board
EFR32BG13 2.4 GHz 10 dBm (SLWRB4104A)
arm
Silicon Laboratories
A picture of the EFR32BG22 Thunderboard (SLTB010A) board
EFR32BG22 Thunderboard (SLTB010A)
arm
Silicon Laboratories
A picture of the EFR32FG1 2400/868 MHz 13 dBm Dual Band (SLWRB4250B) board
EFR32FG1 2400/868 MHz 13 dBm Dual Band (SLWRB4250B)
arm
Silicon Laboratories
A picture of the EFR32FG13 2400/915 MHz 19 dBm Dual Band (SLWRB4255A) board
EFR32FG13 2400/915 MHz 19 dBm Dual Band (SLWRB4255A)
arm
Silicon Laboratories
A picture of the EFR32MG12 2.4 GHz 19 dBm (SLWRB4161A) board
EFR32MG12 2.4 GHz 19 dBm (SLWRB4161A)
arm
Silicon Laboratories
A picture of the EFR32MG12 2400/868-915 MHz 19 dBm Dual Band (SLWRB4170A) board
EFR32MG12 2400/868-915 MHz 19 dBm Dual Band (SLWRB4170A)
arm
Silicon Laboratories
A picture of the EFR32MG12 Thunderboard (SLTB004A) board
EFR32MG12 Thunderboard (SLTB004A)
arm
Silicon Laboratories
A picture of the EFR32xG21 2.4 GHz 20 dBm (SLWRB4180A) board
EFR32xG21 2.4 GHz 20 dBm (SLWRB4180A)
arm
Silicon Laboratories
A picture of the EFR32xG21 2.4 GHz 20 dBm (SLWRB4180B) board
EFR32xG21 2.4 GHz 20 dBm (SLWRB4180B)
arm
Silicon Laboratories
A picture of the EFR32xG23 868-915 MHz 20 dBm (xG23-RB4210A) board
EFR32xG23 868-915 MHz 20 dBm (xG23-RB4210A)
arm
Silicon Laboratories
A picture of the EFR32xG24 2.4 GHz 20 dBm (xG24-RB4187C) board
EFR32xG24 2.4 GHz 20 dBm (xG24-RB4187C)
arm
Silicon Laboratories
A picture of the EFR32xG24 Dev Kit (xG24-DK2601B) board
EFR32xG24 Dev Kit (xG24-DK2601B)
arm
Silicon Laboratories
EFR32xG24 Explorer Kit (xG24-EK2703A)
arm
Silicon Laboratories
A picture of the EFR32xG27 Dev Kit (xG27-DK2602A) board
EFR32xG27 Dev Kit (xG27-DK2602A)
arm
Silicon Laboratories
EFR32xG29 2.4 GHz 8 dBm Buck (xG29-RB4412A)
arm
Renesas Electronics Corporation
A picture of the ek_ra2l1 board
ek_ra2l1
arm
Aesc Silicon
ElemRV-N
riscv
Intel Corporation
Elkhart Lake CRB
x86
ENE Technology, Inc.
ENE KB1062_EVB
arm
ENE Technology, Inc.
ENE KB1200_EVB
arm
Espressif Systems
A picture of the ESP-WROVER-KIT board
ESP-WROVER-KIT
xtensa
Espressif Systems
A picture of the ESP32-C3-DevKit-RUST board
ESP32-C3-DevKit-RUST
riscv
Espressif Systems
A picture of the ESP32-C3-DevKitC board
ESP32-C3-DevKitC
riscv
Espressif Systems
A picture of the ESP32-C3-DevKitM board
ESP32-C3-DevKitM
riscv
Other/Unknown
A picture of the ESP32-C3-SUPERMINI board
ESP32-C3-SUPERMINI
riscv
Espressif Systems
A picture of the ESP32-C6-DevKitC board
ESP32-C6-DevKitC
riscv
Espressif Systems
A picture of the ESP32-DevKitC board
ESP32-DevKitC
xtensa
Espressif Systems
A picture of the ESP32-Ethernet-Kit board
ESP32-Ethernet-Kit
xtensa
OLIMEX Ltd.
A picture of the ESP32-EVB board
ESP32-EVB
xtensa
Franzininho
A picture of the ESP32-S2 Franzininho board
ESP32-S2 Franzininho
xtensa
WEMOS Electronics
A picture of the ESP32-S2 Lolin Mini board
ESP32-S2 Lolin Mini
xtensa
Espressif Systems
A picture of the ESP32-S2-DevKitC board
ESP32-S2-DevKitC
xtensa
Espressif Systems
A picture of the ESP32-S2-Saola board
ESP32-S2-Saola
xtensa
Espressif Systems
A picture of the ESP32-S3-DevKitC board
ESP32-S3-DevKitC
xtensa
Espressif Systems
A picture of the ESP32-S3-DevKitM board
ESP32-S3-DevKitM
xtensa
Espressif Systems
A picture of the ESP32-S3-EYE board
ESP32-S3-EYE
xtensa
Waveshare Electronics
A picture of the ESP32-S3-Matrix board
ESP32-S3-Matrix
xtensa
Waveshare Electronics
A picture of the ESP32-S3-Touch-LCD-1.28 board
ESP32-S3-Touch-LCD-1.28
xtensa
01Space
A picture of the ESP32C3 0.42 OLED board
ESP32C3 0.42 OLED
riscv
LuatOS Team
A picture of the ESP32C3_LUATOS_CORE board
ESP32C3_LUATOS_CORE
riscv
LuatOS Team
A picture of the ESP32S3-Luatos-Core board
ESP32S3-Luatos-Core
xtensa
Espressif Systems
A picture of the ESP8684-DevKitM board
ESP8684-DevKitM
riscv
Analog Devices, Inc.
A picture of the EVAL-ADIN1110EVB Evaluation board board
EVAL-ADIN1110EVB Evaluation board
arm
Analog Devices, Inc.
A picture of the EVAL-ADIN2111EVB Evaluation board board
EVAL-ADIN2111EVB Evaluation board
arm
u-blox
A picture of the EVK NINA-B11x board
EVK NINA-B11x
arm
u-blox
A picture of the EVK NINA-B40x board
EVK NINA-B40x
arm
u-blox
A picture of the EVK-ANNA-B11x board
EVK-ANNA-B11x
arm
u-blox
A picture of the EVK-BMD-30/35: BMD-300-EVAL, BMD-301-EVAL, and BMD-350-EVAL board
EVK-BMD-30/35: BMD-300-EVAL, BMD-301-EVAL, and BMD-350-EVAL
arm
u-blox
A picture of the EVK-BMD-330: BMD-330-EVAL board
EVK-BMD-330: BMD-330-EVAL
arm
u-blox
A picture of the EVK-BMD-34/38: BMD-340-EVAL and BMD-341-EVAL board
EVK-BMD-34/38: BMD-340-EVAL and BMD-341-EVAL
arm
u-blox
A picture of the EVK-BMD-34/38: BMD-345-EVAL board
EVK-BMD-34/38: BMD-345-EVAL
arm
u-blox
A picture of the EVK-BMD-34/48: BMD-380-EVAL board
EVK-BMD-34/48: BMD-380-EVAL
arm
u-blox
A picture of the EVK-BMD-360: BMD-360-EVAL board
EVK-BMD-360: BMD-360-EVAL
arm
u-blox
A picture of the EVK-IRIS-W106-RW612 board
EVK-IRIS-W106-RW612
arm
u-blox
A picture of the EVK-NINA-B3 board
EVK-NINA-B3
arm
Adafruit Industries, LLC
A picture of the Feather M0 Basic Proto board
Feather M0 Basic Proto
arm
Adafruit Industries, LLC
A picture of the Feather M0 LoRa board
Feather M0 LoRa
arm
Adafruit Industries, LLC
A picture of the Feather M4 Express board
Feather M4 Express
arm
Adafruit Industries, LLC
A picture of the Feather nRF52840 (Express, Sense) board
Feather nRF52840 (Express, Sense)
arm
Adafruit Industries, LLC
A picture of the Feather STM32F405 Express board
Feather STM32F405 Express
arm
M5Stack
A picture of the Fire board
Fire
xtensa
Seagate Technology PLC
A picture of the FireCuda Gaming SSD (FaZe) board board
FireCuda Gaming SSD (FaZe) board
arm
FANKE Technology Co., Ltd.
A picture of the FK743M5-XIH6 board
FK743M5-XIH6
arm
FANKE Technology Co., Ltd.
A picture of the FK750M1-VBT6 board
FK750M1-VBT6
arm
FANKE Technology Co., Ltd.
A picture of the FK7B0M1-VBT6 board
FK7B0M1-VBT6
arm
NXP Semiconductors
A picture of the FMURT6 board
FMURT6
arm
NXP Semiconductors
A picture of the FRDM-K22F board
FRDM-K22F
arm
NXP Semiconductors
A picture of the FRDM-K64F board
FRDM-K64F
arm
NXP Semiconductors
A picture of the FRDM-K82F board
FRDM-K82F
arm
NXP Semiconductors
A picture of the FRDM-KE15Z board
FRDM-KE15Z
arm
NXP Semiconductors
A picture of the FRDM-KE17Z board
FRDM-KE17Z
arm
NXP Semiconductors
A picture of the FRDM-KE17Z512 board
FRDM-KE17Z512
arm
NXP Semiconductors
A picture of the FRDM-KL25Z board
FRDM-KL25Z
arm
NXP Semiconductors
A picture of the FRDM-KW41Z board
FRDM-KW41Z
arm
NXP Semiconductors
A picture of the FRDM-MCXA153 board
FRDM-MCXA153
arm
NXP Semiconductors
A picture of the FRDM-MCXA156 board
FRDM-MCXA156
arm
NXP Semiconductors
A picture of the FRDM-MCXA166 board
FRDM-MCXA166
arm
NXP Semiconductors
A picture of the FRDM-MCXA276 board
FRDM-MCXA276
arm
NXP Semiconductors
A picture of the FRDM-MCXC242 board
FRDM-MCXC242
arm
NXP Semiconductors
A picture of the FRDM-MCXC444 board
FRDM-MCXC444
arm
NXP Semiconductors
A picture of the FRDM-MCXN236 board
FRDM-MCXN236
arm
NXP Semiconductors
A picture of the FRDM-MCXN947 board
FRDM-MCXN947
arm
NXP Semiconductors
A picture of the FRDM-MCXW71 board
FRDM-MCXW71
arm
NXP Semiconductors
A picture of the FRDM-MCXW72 board
FRDM-MCXW72
arm
NXP Semiconductors
A picture of the FRDM_RW612 board
FRDM_RW612
arm
sensry.io
A picture of the Ganymed Break-Out-Board (BOB) board
Ganymed Break-Out-Board (BOB)
riscv
sensry.io
A picture of the Ganymed Starter Kit (SK) board
Ganymed Starter Kit (SK)
riscv
GigaDevice Semiconductor
A picture of the GD32A503V-EVAL board
GD32A503V-EVAL
arm
GigaDevice Semiconductor
A picture of the GD32E103V-EVAL board
GD32E103V-EVAL
arm
GigaDevice Semiconductor
A picture of the GD32E507V-START board
GD32E507V-START
arm
GigaDevice Semiconductor
A picture of the GD32E507Z-EVAL board
GD32E507Z-EVAL
arm
GigaDevice Semiconductor
A picture of the GD32F350R-EVAL board
GD32F350R-EVAL
arm
GigaDevice Semiconductor
A picture of the GD32F403Z-EVAL board
GD32F403Z-EVAL
arm
GigaDevice Semiconductor
A picture of the GD32F407V-START board
GD32F407V-START
arm
GigaDevice Semiconductor
A picture of the GD32F450I-EVAL board
GD32F450I-EVAL
arm
GigaDevice Semiconductor
A picture of the GD32F450V-START board
GD32F450V-START
arm
GigaDevice Semiconductor
A picture of the GD32F450Z-EVAL board
GD32F450Z-EVAL
arm
GigaDevice Semiconductor
A picture of the GD32F470I-EVAL board
GD32F470I-EVAL
arm
GigaDevice Semiconductor
A picture of the GD32L233R-EVA board
GD32L233R-EVA
arm
GigaDevice Semiconductor
A picture of the GD32VF103C-STARTER board
GD32VF103C-STARTER
riscv
GigaDevice Semiconductor
A picture of the GD32VF103V-EVAL board
GD32VF103V-EVAL
riscv
Gaisler
Generic LEON3
sparc
Gaisler
A picture of the GR716-MINI Development Board board
GR716-MINI Development Board
sparc
Adafruit Industries, LLC
A picture of the Grand Central M4 Express board
Grand Central M4 Express
arm
NXP Semiconductors
A picture of the Hexiwear board
Hexiwear
arm
SiFive, Inc.
A picture of the HiFive Unleashed board
HiFive Unleashed
riscv
SiFive, Inc.
A picture of the HiFive Unmatched board
HiFive Unmatched
riscv
SiFive, Inc.
A picture of the HiFive1 board
HiFive1
riscv
SiFive, Inc.
A picture of the HiFive1 Rev B board
HiFive1 Rev B
riscv
Toradex AG
A picture of the i.MX 7 Computer on Module - Colibri iMX7 board
i.MX 7 Computer on Module - Colibri iMX7
arm
NXP Semiconductors
i.MX 8QuadMax Multisensory Enablement Kit (MEK)
xtensa
NXP Semiconductors
i.MX 8QuadXPlus Multisensory Enablement Kit (MEK)
xtensa
NXP Semiconductors
i.MX 8ULP Evaluation Kit
xtensa
NXP Semiconductors
i.MX8MM EVK
arm, arm64
NXP Semiconductors
i.MX8MN EVK (Cortex-A53)
arm64
NXP Semiconductors
i.MX8MP EVK
arm, xtensa, arm64
NXP Semiconductors
i.MX91 EVK
arm64
NXP Semiconductors
i.MX93 EVK
arm, arm64
NXP Semiconductors
i.MX943 EVK
arm, arm64
NXP Semiconductors
i.MX95 EVK
arm, arm64
Actinius B.V.
A picture of the Icarus board
Icarus
arm
Actinius B.V.
A picture of the Icarus Bee board
Icarus Bee
arm
Actinius B.V.
A picture of the Icarus SoM board
Icarus SoM
arm
Actinius B.V.
A picture of the Icarus SoM DK board
Icarus SoM DK
arm
Other/Unknown
A picture of the ICE-V Wireless board
ICE-V Wireless
riscv
Google, Inc.
Icetower Development Board
arm
Intel Corporation
Integrated Sensor Hub (ISH) 5.4.1
x86
Intel Corporation
Integrated Sensor Hub (ISH) 5.6.0
x86
Intel Corporation
Integrated Sensor Hub (ISH) 5.8.0
x86
Intel Corporation
Intel ADSP
xtensa
Intel Corporation
INTEL FPGA niosv_g
riscv
Intel Corporation
INTEL FPGA niosv_m
riscv
SEGGER Microcontroller GmbH
A picture of the IP Switch Board board
IP Switch Board
arm
ITE Tech. Inc.
A picture of the IT51XXX series board
IT51XXX series
riscv
ITE Tech. Inc.
A picture of the IT82XX2 series board
IT82XX2 series
riscv
ITE Tech. Inc.
A picture of the IT8XXX2 series board
IT8XXX2 series
riscv
Adafruit Industries, LLC
A picture of the ItsyBitsy M4 Express board
ItsyBitsy M4 Express
arm
Adafruit Industries, LLC
A picture of the ItsyBitsy nRF52840 board
ItsyBitsy nRF52840
arm
Adafruit Industries, LLC
A picture of the KB2040 board
KB2040
arm
KinCony Electronics Co., Ltd.
A picture of the KC868-A32 board
KC868-A32
xtensa
Advanced Micro Devices (AMD), Inc.
A picture of the KV260 Development Board RPU Cortex-R5 board
KV260 Development Board RPU Cortex-R5
arm
Electronut Labs
A picture of the Labs Blip board
Labs Blip
arm
Electronut Labs
A picture of the Labs Papyr board
Labs Papyr
arm
Seagate Technology PLC
A picture of the Legend board
Legend
arm
Witte Technology
A picture of the Linum Board board
Linum Board
arm
EnjoyDigital
A picture of the LiteX VexRiscv board
LiteX VexRiscv
riscv
Ronoth
A picture of the LoDev board
LoDev
arm
Shenzhen Sipeed Technology Co., Ltd.
A picture of the Longan Nano board
Longan Nano
riscv
OLIMEX Ltd.
A picture of the LoRa STM32WL DevKit board
LoRa STM32WL DevKit
arm
Seeed Technology Co., Ltd
A picture of the LoRa-E5 Dev Board board
LoRa-E5 Dev Board
arm
Seeed Technology Co., Ltd
A picture of the LoRa-E5 mini board
LoRa-E5 mini
arm
NXP Semiconductors
A picture of the LPCXpresso11U68 board
LPCXpresso11U68
arm
NXP Semiconductors
A picture of the LPCXPRESSO51U68 board
LPCXPRESSO51U68
arm
NXP Semiconductors
A picture of the LPCXPRESSO54114 board
LPCXPRESSO54114
arm
NXP Semiconductors
A picture of the LPCXpresso55S06 board
LPCXpresso55S06
arm
NXP Semiconductors
A picture of the LPCXpresso55S16 board
LPCXpresso55S16
arm
NXP Semiconductors
A picture of the LPCXpresso55S28 board
LPCXpresso55S28
arm
NXP Semiconductors
A picture of the LPCXpresso55S36 board
LPCXpresso55S36
arm
NXP Semiconductors
A picture of the LPCXPRESSO55S69 board
LPCXPRESSO55S69
arm
NXP Semiconductors
LS1046A RDB
arm64
Dragino Technology Co., Limited
A picture of the LSN50 LoRA Sensor Node board
LSN50 LoRA Sensor Node
arm
Microchip Technology Inc.
M2GL025 Mi-V
riscv
M5Stack
M5StickC PLUS
xtensa
Analog Devices, Inc.
A picture of the MAX32650EVKIT board
MAX32650EVKIT
arm
Analog Devices, Inc.
A picture of the MAX32650FTHR board
MAX32650FTHR
arm
Analog Devices, Inc.
A picture of the MAX32655EVKIT board
MAX32655EVKIT
arm
Analog Devices, Inc.
A picture of the MAX32655FTHR board
MAX32655FTHR
arm
Analog Devices, Inc.
A picture of the max32657evkit board
max32657evkit
arm
Analog Devices, Inc.
A picture of the MAX32660EVSYS board
MAX32660EVSYS
arm
Analog Devices, Inc.
A picture of the MAX32662EVKIT board
MAX32662EVKIT
arm
Analog Devices, Inc.
A picture of the MAX32666EVKIT board
MAX32666EVKIT
arm
Analog Devices, Inc.
A picture of the MAX32666FTHR board
MAX32666FTHR
arm
Analog Devices, Inc.
A picture of the MAX32670EVKIT board
MAX32670EVKIT
arm
Analog Devices, Inc.
A picture of the MAX32672EVKIT board
MAX32672EVKIT
arm
Analog Devices, Inc.
A picture of the MAX32672FTHR board
MAX32672FTHR
arm
Analog Devices, Inc.
A picture of the MAX32675EVKIT board
MAX32675EVKIT
arm
Analog Devices, Inc.
A picture of the MAX32680EVKIT board
MAX32680EVKIT
arm
Analog Devices, Inc.
A picture of the MAX32690EVKIT board
MAX32690EVKIT
arm
Analog Devices, Inc.
A picture of the MAX32690FTHR board
MAX32690FTHR
arm
Analog Devices, Inc.
A picture of the MAX78000EVKIT board
MAX78000EVKIT
arm
Analog Devices, Inc.
A picture of the MAX78000FTHR board
MAX78000FTHR
arm
Analog Devices, Inc.
A picture of the MAX78002EVKIT board
MAX78002EVKIT
arm
NXP Semiconductors
A picture of the MCX-N9XX-EVK board
MCX-N9XX-EVK
arm
NXP Semiconductors
A picture of the MCXW72-EVK board
MCXW72-EVK
arm
Raytac Corporation
A picture of the MDBT50Q-CX-40 Dongle board
MDBT50Q-CX-40 Dongle
arm
Raytac Corporation
A picture of the MDBT50Q-DB-33 board
MDBT50Q-DB-33
arm
Raytac Corporation
A picture of the MDBT50Q-DB-40 board
MDBT50Q-DB-40
arm
Raytac Corporation
A picture of the MDBT53-DB-40 board
MDBT53-DB-40
arm
Raytac Corporation
A picture of the MDBT53V-DB-40 board
MDBT53V-DB-40
arm
Microchip Technology Inc.
A picture of the MEC1501 Modular card ASSY6885 board
MEC1501 Modular card ASSY6885
arm
Microchip Technology Inc.
A picture of the MEC15xxEVB ASSY6853 board
MEC15xxEVB ASSY6853
arm
Microchip Technology Inc.
A picture of the MEC172x Modular Card ASSY6930 (Rev. B) board
MEC172x Modular Card ASSY6930 (Rev. B)
arm
Microchip Technology Inc.
A picture of the MEC172xEVB ASSY6906 board
MEC172xEVB ASSY6906
arm
Microchip Technology Inc.
A picture of the MEC17xxEVB ASSY6941 board
MEC17xxEVB ASSY6941
arm
96Boards
A picture of the Meerkat96 board
Meerkat96
arm
Enclustra
MERCURY-XU
arm
BBC
A picture of the micro:bit board
micro:bit
arm
BBC
A picture of the micro:bit V2 board
micro:bit V2
arm
SparkFun Electronics
A picture of the MicroMod board Processor board
MicroMod board Processor
arm
MikroElektronika d.o.o.
A picture of the MikroE Quail board
MikroE Quail
arm
NXP Semiconductors
A picture of the MIMX8MQ EVK board
MIMX8MQ EVK
arm
NXP Semiconductors
A picture of the MIMXRT1010-EVK board
MIMXRT1010-EVK
arm
NXP Semiconductors
A picture of the MIMXRT1015-EVK board
MIMXRT1015-EVK
arm
NXP Semiconductors
A picture of the MIMXRT1020-EVK board
MIMXRT1020-EVK
arm
NXP Semiconductors
A picture of the MIMXRT1024-EVK board
MIMXRT1024-EVK
arm
NXP Semiconductors
A picture of the MIMXRT1040-EVK board
MIMXRT1040-EVK
arm
NXP Semiconductors
A picture of the MIMXRT1050-EVK board
MIMXRT1050-EVK
arm
NXP Semiconductors
A picture of the MIMXRT1060-EVK board
MIMXRT1060-EVK
arm
NXP Semiconductors
A picture of the MIMXRT1064-EVK board
MIMXRT1064-EVK
arm
NXP Semiconductors
A picture of the MIMXRT1160-EVK board
MIMXRT1160-EVK
arm
NXP Semiconductors
A picture of the MIMXRT1170-EVK/EVKB board
MIMXRT1170-EVK/EVKB
arm
NXP Semiconductors
A picture of the MIMXRT1180-EVK board
MIMXRT1180-EVK
arm
NXP Semiconductors
A picture of the MIMXRT595-EVK board
MIMXRT595-EVK
arm, xtensa
NXP Semiconductors
A picture of the MIMXRT685-EVK board
MIMXRT685-EVK
arm, xtensa
NXP Semiconductors
MIMXRT700-EVK
arm, xtensa
MikroElektronika d.o.o.
A picture of the MINI-M4 for STM32 board
MINI-M4 for STM32
arm
WeAct Studio
A picture of the MiniSTM32H743 Core Board board
MiniSTM32H743 Core Board
arm
WeAct Studio
A picture of the MiniSTM32H7B0 Core Board board
MiniSTM32H7B0 Core Board
arm
Makerbase Co., Ltd.
A picture of the MKS CANable V2.0 board
MKS CANable V2.0
arm
Microchip Technology Inc.
mpfs_icicle
riscv
ARM Ltd.
A picture of the MPS3 AN547 board
MPS3 AN547
arm
ARM Ltd.
MPS4
arm
NXP Semiconductors
A picture of the MR-CANHUBK3 board
MR-CANHUBK3
arm
Texas Instruments
A picture of the MSP-EXP432P401R LaunchXL board
MSP-EXP432P401R LaunchXL
arm
Texas Instruments
A picture of the MSPM0G3507 Launchpad board
MSPM0G3507 Launchpad
arm
MediaTek Inc.
mt8186
MediaTek Inc.
mt8188
MediaTek Inc.
MT8195 ADSP
MediaTek Inc.
mt8196
Antmicro
A picture of the Myra SiP Baseboard board
Myra SiP Baseboard
arm
The Zephyr Project
Native simulator - native_sim
posix
Dragino Technology Co., Limited
A picture of the NBSN95 NB-IoT Sensor Node board
NBSN95 NB-IoT Sensor Node
arm
Udoo
A picture of the Neo Full board
Neo Full
arm
96Boards
A picture of the Neonkey board
Neonkey
arm
Other/Unknown
A picture of the NEORV32 board
NEORV32
riscv
96Boards
A picture of the Nitrogen board
Nitrogen
arm
Nuvoton Technology Corporation
A picture of the NPCK3M8K_EVB board
NPCK3M8K_EVB
arm
Nuvoton Technology Corporation
A picture of the NPCM400_EVB board
NPCM400_EVB
arm
Nuvoton Technology Corporation
A picture of the NPCX4M8F_EVB board
NPCX4M8F_EVB
arm
Nuvoton Technology Corporation
A picture of the NPCX7M6FB_EVB board
NPCX7M6FB_EVB
arm
Nuvoton Technology Corporation
A picture of the NPCX9M6F_EVB board
NPCX9M6F_EVB
arm
Nordic Semiconductor
A picture of the nRF21540 DK board
nRF21540 DK
arm
Nordic Semiconductor
A picture of the nRF51 DK board
nRF51 DK
arm
Nordic Semiconductor
A picture of the nRF51 Dongle board
nRF51 Dongle
arm
VNGIoTLab
A picture of the nRF51-VBLUno51 board
nRF51-VBLUno51
arm
Adafruit Industries, LLC
A picture of the nRF52 Adafruit Feather board
nRF52 Adafruit Feather
arm
Nordic Semiconductor
A picture of the nRF52 DK board
nRF52 DK
arm
The Zephyr Project
nRF52 simulated board (BabbleSim)
posix
VNGIoTLab
A picture of the nRF52-VBLUno52 board
nRF52-VBLUno52
arm
SparkFun Electronics
nRF52832 breakout
arm
Shenzhen Zaowubang Technology Co., Ltd.
nRF52832-mdk
arm
Nordic Semiconductor
A picture of the nRF52833 DK board
nRF52833 DK
arm
Nordic Semiconductor
A picture of the nRF52840 DK board
nRF52840 DK
arm
Nordic Semiconductor
A picture of the nRF52840 Dongle board
nRF52840 Dongle
arm
Shenzhen Zaowubang Technology Co., Ltd.
A picture of the nRF52840 MDK USB Dongle board
nRF52840 MDK USB Dongle
arm
Shenzhen Zaowubang Technology Co., Ltd.
nRF52840-mdk
arm
Nordic Semiconductor
A picture of the nRF5340 Audio DK board
nRF5340 Audio DK
arm
Nordic Semiconductor
A picture of the nRF5340 DK board
nRF5340 DK
arm
The Zephyr Project
nRF5340 simulated boards (BabbleSim)
posix
Nordic Semiconductor
A picture of the nRF54H20 DK board
nRF54H20 DK
arm, riscv
Nordic Semiconductor
nRF54L09 PDK
arm, riscv
Nordic Semiconductor
A picture of the nRF54L15 DK board
nRF54L15 DK
arm, riscv
The Zephyr Project
nRF54L15 simulated boards (BabbleSim)
posix
Nordic Semiconductor
nRF54L20 PDK
arm, riscv
Nordic Semiconductor
nRF54LM20 DK
arm, riscv
Nordic Semiconductor
A picture of the nRF7002 DK board
nRF7002 DK
arm
Nordic Semiconductor
A picture of the nRF9131 EK board
nRF9131 EK
arm
Nordic Semiconductor
A picture of the nRF9151 DK board
nRF9151 DK
arm
Nordic Semiconductor
A picture of the nRF9160 DK board
nRF9160 DK
arm
Circuit Dojo
A picture of the nRF9160 Feather board
nRF9160 Feather
arm
innblue UG
A picture of the nRF9160 INNBLUE21 board
nRF9160 INNBLUE21
arm
innblue UG
A picture of the nRF9160 INNBLUE22 board
nRF9160 INNBLUE22
arm
SparkFun Electronics
A picture of the nRF9160 Thing Plus board
nRF9160 Thing Plus
arm
Nordic Semiconductor
A picture of the nRF9161 DK board
nRF9161 DK
arm
Nordic Semiconductor
nRF9280 PDK
arm, riscv
STMicroelectronics
A picture of the Nucleo C031C6 board
Nucleo C031C6
arm
STMicroelectronics
A picture of the Nucleo C071RB board
Nucleo C071RB
arm
STMicroelectronics
A picture of the Nucleo F030R8 board
Nucleo F030R8
arm
STMicroelectronics
A picture of the Nucleo F031K6 board
Nucleo F031K6
arm
STMicroelectronics
A picture of the Nucleo F042K6 board
Nucleo F042K6
arm
STMicroelectronics
A picture of the Nucleo F070RB board
Nucleo F070RB
arm
STMicroelectronics
A picture of the Nucleo F072RB board
Nucleo F072RB
arm
STMicroelectronics
A picture of the Nucleo F091RC board
Nucleo F091RC
arm
STMicroelectronics
A picture of the Nucleo F103RB board
Nucleo F103RB
arm
STMicroelectronics
A picture of the Nucleo F207ZG board
Nucleo F207ZG
arm
STMicroelectronics
A picture of the Nucleo F302R8 board
Nucleo F302R8
arm
STMicroelectronics
A picture of the Nucleo F303K8 board
Nucleo F303K8
arm
STMicroelectronics
A picture of the Nucleo F303RE board
Nucleo F303RE
arm
STMicroelectronics
A picture of the Nucleo F334R8 board
Nucleo F334R8
arm
STMicroelectronics
A picture of the Nucleo F401RE board
Nucleo F401RE
arm
STMicroelectronics
A picture of the Nucleo F410RB board
Nucleo F410RB
arm
STMicroelectronics
A picture of the Nucleo F411RE board
Nucleo F411RE
arm
STMicroelectronics
A picture of the Nucleo F412ZG board
Nucleo F412ZG
arm
STMicroelectronics
A picture of the Nucleo F413ZH board
Nucleo F413ZH
arm
STMicroelectronics
A picture of the Nucleo F429ZI board
Nucleo F429ZI
arm
STMicroelectronics
Nucleo F439ZI
arm
STMicroelectronics
A picture of the Nucleo F446RE board
Nucleo F446RE
arm
STMicroelectronics
A picture of the Nucleo F446ZE board
Nucleo F446ZE
arm
STMicroelectronics
A picture of the Nucleo F722ZE board
Nucleo F722ZE
arm
STMicroelectronics
A picture of the Nucleo F746ZG board
Nucleo F746ZG
arm
STMicroelectronics
A picture of the Nucleo F756ZG board
Nucleo F756ZG
arm
STMicroelectronics
A picture of the Nucleo F767ZI board
Nucleo F767ZI
arm
STMicroelectronics
A picture of the Nucleo G031K8 board
Nucleo G031K8
arm
STMicroelectronics
A picture of the Nucleo G070RB board
Nucleo G070RB
arm
STMicroelectronics
A picture of the Nucleo G071RB board
Nucleo G071RB
arm
STMicroelectronics
A picture of the Nucleo G0B1RE board
Nucleo G0B1RE
arm
STMicroelectronics
A picture of the Nucleo G431KB board
Nucleo G431KB
arm
STMicroelectronics
A picture of the Nucleo G431RB board
Nucleo G431RB
arm
STMicroelectronics
A picture of the Nucleo G474RE board
Nucleo G474RE
arm
STMicroelectronics
A picture of the Nucleo H503RB board
Nucleo H503RB
arm
STMicroelectronics
A picture of the Nucleo H533RE board
Nucleo H533RE
arm
STMicroelectronics
A picture of the Nucleo H563ZI board
Nucleo H563ZI
arm
STMicroelectronics
A picture of the Nucleo H723ZG board
Nucleo H723ZG
arm
STMicroelectronics
A picture of the Nucleo H743ZI board
Nucleo H743ZI
arm
STMicroelectronics
A picture of the Nucleo H745ZI-Q board
Nucleo H745ZI-Q
arm
STMicroelectronics
A picture of the Nucleo H753ZI board
Nucleo H753ZI
arm
STMicroelectronics
A picture of the Nucleo H755ZI-Q board
Nucleo H755ZI-Q
arm
STMicroelectronics
A picture of the Nucleo H7A3ZI-Q board
Nucleo H7A3ZI-Q
arm
STMicroelectronics
A picture of the Nucleo H7S3L8 board
Nucleo H7S3L8
arm
STMicroelectronics
A picture of the Nucleo L011K4 board
Nucleo L011K4
arm
STMicroelectronics
A picture of the Nucleo L031K6 board
Nucleo L031K6
arm
STMicroelectronics
A picture of the Nucleo L053R8 board
Nucleo L053R8
arm
STMicroelectronics
A picture of the Nucleo L073RZ board
Nucleo L073RZ
arm
STMicroelectronics
A picture of the Nucleo L152RE board
Nucleo L152RE
arm
STMicroelectronics
A picture of the Nucleo L412RB-P board
Nucleo L412RB-P
arm
STMicroelectronics
A picture of the Nucleo L432KC board
Nucleo L432KC
arm
STMicroelectronics
A picture of the Nucleo L433RC board
Nucleo L433RC
arm
STMicroelectronics
A picture of the Nucleo L452RE board
Nucleo L452RE
arm
STMicroelectronics
A picture of the Nucleo L476RG board
Nucleo L476RG
arm
STMicroelectronics
A picture of the Nucleo L496ZG board
Nucleo L496ZG
arm
STMicroelectronics
Nucleo L4A6ZG
arm
STMicroelectronics
A picture of the Nucleo L4R5ZI board
Nucleo L4R5ZI
arm
STMicroelectronics
A picture of the Nucleo L552ZE Q board
Nucleo L552ZE Q
arm
STMicroelectronics
A picture of the Nucleo N657X0-Q board
Nucleo N657X0-Q
arm
STMicroelectronics
A picture of the Nucleo U031R8 board
Nucleo U031R8
arm
STMicroelectronics
A picture of the Nucleo U083RC board
Nucleo U083RC
arm
STMicroelectronics
A picture of the Nucleo U385RG Q board
Nucleo U385RG Q
arm
STMicroelectronics
Nucleo U575ZI Q
arm
STMicroelectronics
Nucleo U5A5ZJ Q
arm
STMicroelectronics
A picture of the Nucleo WB05KZ board
Nucleo WB05KZ
arm
STMicroelectronics
A picture of the Nucleo WB07CC board
Nucleo WB07CC
arm
STMicroelectronics
A picture of the Nucleo WB09KE board
Nucleo WB09KE
arm
STMicroelectronics
A picture of the Nucleo WB55RG board
Nucleo WB55RG
arm
STMicroelectronics
A picture of the Nucleo WBA55CG board
Nucleo WBA55CG
arm
STMicroelectronics
A picture of the Nucleo WBA65RI board
Nucleo WBA65RI
arm
STMicroelectronics
A picture of the Nucleo WL55JC board
Nucleo WL55JC
arm
Nuvoton Technology Corporation
A picture of the NUMAKER M2L31KI board
NUMAKER M2L31KI
arm
Nuvoton Technology Corporation
A picture of the NUMAKER M55M1 board
NUMAKER M55M1
arm
Nuvoton Technology Corporation
A picture of the NUMAKER PFM M467 board
NUMAKER PFM M467
arm
Nuvoton Technology Corporation
A picture of the NUMAKER PFM M487 board
NUMAKER PFM M487
arm
Würth Elektronik GmbH.
A picture of the Oceanus-I EV board
Oceanus-I EV
arm
Norik Systems
A picture of the Octopus IO-Board board
Octopus IO-Board
arm
Norik Systems
A picture of the Octopus SoM board
Octopus SoM
arm
Hardkernel Co., Ltd
A picture of the ODROID-GO board
ODROID-GO
xtensa
OLIMEX Ltd.
A picture of the OLIMEX-STM32-E407 board
OLIMEX-STM32-E407
arm
OLIMEX Ltd.
A picture of the OLIMEX-STM32-H103 board
OLIMEX-STM32-H103
arm
OLIMEX Ltd.
A picture of the OLIMEX-STM32-H405 board
OLIMEX-STM32-H405
arm
OLIMEX Ltd.
A picture of the OLIMEX-STM32-H407 board
OLIMEX-STM32-H407
arm
OLIMEX Ltd.
A picture of the OLIMEX-STM32-P405 board
OLIMEX-STM32-P405
arm
OLIMEX Ltd.
A picture of the OLIMEXINO-STM32 board
OLIMEXINO-STM32
arm
Waveshare Electronics
A picture of the Open103Z board
Open103Z
arm
open-isa.org
A picture of the OpenISA VEGAboard board
OpenISA VEGAboard
riscv
lowRISC Community Interest Company
OpenTitan Earl Grey
riscv
Würth Elektronik GmbH.
A picture of the Ophelia-I EV NRF52805 board
Ophelia-I EV NRF52805
arm
Würth Elektronik GmbH.
A picture of the Ophelia-IV DK board
Ophelia-IV DK
arm, riscv
Würth Elektronik GmbH.
A picture of the Orthosie-I-EV board
Orthosie-I-EV
riscv
Octavo Systems LLC
A picture of the OSD32MP1-BRK board
OSD32MP1-BRK
arm
Panasonic Corporation
A picture of the PAN B511 Evaluation Board board
PAN B511 Evaluation Board
arm, riscv
Panasonic Corporation
A picture of the PAN1770 Evaluation Board board
PAN1770 Evaluation Board
arm
Panasonic Corporation
A picture of the PAN1780 Evaluation Board board
PAN1780 Evaluation Board
arm
Panasonic Corporation
A picture of the PAN1781 Evaluation Board board
PAN1781 Evaluation Board
arm
Panasonic Corporation
A picture of the PAN1782 Evaluation Board board
PAN1782 Evaluation Board
arm
Panasonic Corporation
A picture of the PAN1783 Evaluation Board board
PAN1783 Evaluation Board
arm
Panasonic Corporation
A picture of the PAN1783A Evaluation Board board
PAN1783A Evaluation Board
arm
Panasonic Corporation
A picture of the PAN1783A-PA Evaluation Board board
PAN1783A-PA Evaluation Board
arm
PHYTEC
A picture of the phyBOARD-Electra AM64x M4F Core board
phyBOARD-Electra AM64x M4F Core
arm
PHYTEC
A picture of the phyBOARD-Lyra AM62x A53 Core board
phyBOARD-Lyra AM62x A53 Core
arm, arm64
PHYTEC
A picture of the phyBOARD-Nash i.MX93 board
phyBOARD-Nash i.MX93
arm, arm64
PHYTEC
A picture of the phyBOARD-Polis i.MX8M Mini board
phyBOARD-Polis i.MX8M Mini
arm
PHYTEC
A picture of the phyBOARD-Pollux i.MX8M Plus board
phyBOARD-Pollux i.MX8M Plus
arm
TechNexion
A picture of the Pico-Pi i.MX7D - Android Things IoT Development Platform board
Pico-Pi i.MX7D - Android Things IoT Development Platform
arm
KWS Computersysteme Gmbh
A picture of the Pico-SPE board
Pico-SPE
arm
KWS Computersysteme Gmbh
A picture of the Pico2-SPE board
Pico2-SPE
arm
Pimoroni Ltd.
A picture of the Pimoroni Pico Plus2 board
Pimoroni Pico Plus2
arm
Pine64
A picture of the PineTime DevKit0 board
PineTime DevKit0
arm
Ezurio
A picture of the Pinnacle 100 DVK board
Pinnacle 100 DVK
arm
BeagleBoard.org Foundation
A picture of the PocketBeagle 2 board
PocketBeagle 2
arm, arm64
Other/Unknown
A picture of the Pro Micro nRF52840 board
Pro Micro nRF52840
arm
SparkFun Electronics
A picture of the Pro Micro RP2040 board
Pro Micro RP2040
arm
Würth Elektronik GmbH.
A picture of the Proteus-II-EV board
Proteus-II-EV
arm
Würth Elektronik GmbH.
A picture of the Proteus-III-EV board
Proteus-III-EV
arm
Infineon Technologies
A picture of the PSOC 6 AI Evaluation Kit board
PSOC 6 AI Evaluation Kit
arm
Cypress Semiconductor Corporation
A picture of the PSOC 6 WiFi-BT Pioneer Kit board
PSOC 6 WiFi-BT Pioneer Kit
arm
Infineon Technologies
A picture of the PSOC 62S4 Pioneer Kit board
PSOC 62S4 Pioneer Kit
arm
Cypress Semiconductor Corporation
A picture of the PSOC 63 BLE Pioneer Kit board
PSOC 63 BLE Pioneer Kit
arm
QEMU, a generic and open source machine emulator and virtualizer
QEMU Emulation for ARCv2 & ARCv3
arc
ARM Ltd.
QEMU Emulation for ARM AArch64 Virt KVM
arm64
ARM Ltd.
QEMU Emulation for ARM Cortex-A53
arm64
Nordic Semiconductor
QEMU Emulation for ARM Cortex-M0
arm
QEMU, a generic and open source machine emulator and virtualizer
QEMU Emulation for ARM Cortex-M3
arm
QEMU, a generic and open source machine emulator and virtualizer
QEMU Emulation for ARM Cortex-R5
arm
QEMU, a generic and open source machine emulator and virtualizer
QEMU Emulation for Cortex-A9
arm
Gaisler
QEMU Emulation for LEON3
sparc
QEMU, a generic and open source machine emulator and virtualizer
QEMU Emulation for MIPS Malta
mips
Renesas Electronics Corporation
QEMU Emulation for Renesas RX
rx
QEMU, a generic and open source machine emulator and virtualizer
QEMU Emulation for RISCV32
riscv
QEMU, a generic and open source machine emulator and virtualizer
QEMU Emulation for RISCV32 XIP
riscv
QEMU, a generic and open source machine emulator and virtualizer
QEMU Emulation for RISCV32E
riscv
QEMU, a generic and open source machine emulator and virtualizer
QEMU Emulation for RISCV64
riscv
Intel Corporation
QEMU Emulation for X86
x86
Intel Corporation
QEMU Emulation for X86 / Lakemont CPU
x86
Intel Corporation
QEMU Emulation for X86 64bit
x86
Intel Corporation
QEMU Emulation for X86 Minimal Configuration
x86
Cadence Design Systems Inc.
QEMU Emulation for Xtensa
xtensa
QuickLogic Corp.
A picture of the Qomu board
Qomu
arm
Adafruit Industries, LLC
A picture of the QT Py ESP32-S3 board
QT Py ESP32-S3
xtensa
Adafruit Industries, LLC
A picture of the QT Py RP2040 board
QT Py RP2040
arm
QuickLogic Corp.
A picture of the QuickFeather board
QuickFeather
arm
Google, Inc.
Quincy
arm
Renesas Electronics Corporation
A picture of the R-Car H3ULCB board
R-Car H3ULCB
arm, arm64
Renesas Electronics Corporation
A picture of the R-Car Salvator-X board
R-Car Salvator-X
arm
Renesas Electronics Corporation
A picture of the R-Car Salvator-XS board
R-Car Salvator-XS
arm64
Renesas Electronics Corporation
A picture of the R-Car Spider board
R-Car Spider
arm, arm64
Renesas Electronics Corporation
A picture of the RA2A1 Evaluation Kit board
RA2A1 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA4E1 Fast Prototyping Board board
RA4E1 Fast Prototyping Board
arm
Renesas Electronics Corporation
A picture of the RA4E1 Voice User Reference Kit board
RA4E1 Voice User Reference Kit
arm
Renesas Electronics Corporation
A picture of the RA4E2 Evaluation Kit board
RA4E2 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA4L1 Evaluation Kit board
RA4L1 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA4M1 Evaluation Kit board
RA4M1 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA4M2 Evaluation Kit board
RA4M2 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA4M3 Evaluation Kit board
RA4M3 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA4W1 Evaluation Kit board
RA4W1 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA6E1 Fast Prototyping Board board
RA6E1 Fast Prototyping Board
arm
Renesas Electronics Corporation
A picture of the RA6E2 Evaluation Kit board
RA6E2 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA6E2 Fast Prototyping Board board
RA6E2 Fast Prototyping Board
arm
Renesas Electronics Corporation
A picture of the RA6M1 Evaluation Kit board
RA6M1 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA6M2 Evaluation Kit board
RA6M2 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA6M3 Evaluation Kit board
RA6M3 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA6M4 Evaluation Kit board
RA6M4 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA6M5 Evaluation Kit board
RA6M5 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA8D1 Evaluation Kit board
RA8D1 Evaluation Kit
arm
Shanghai Ruiside Electronic Technology Co., Ltd.
A picture of the RA8D1 Vision Board board
RA8D1 Vision Board
arm
Renesas Electronics Corporation
A picture of the RA8M1 Evaluation Kit board
RA8M1 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA8P1 Evaluation Kit board
RA8P1 Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RA8T1 Motor Control Kit board
RA8T1 Motor Control Kit
arm
RAKwireless Technology Limited
A picture of the RAK11720 board
RAK11720
arm
RAKwireless Technology Limited
A picture of the RAK3172 board
RAK3172
arm
RAKwireless Technology Limited
A picture of the RAK4631 board
RAK4631
arm
RAKwireless Technology Limited
A picture of the RAK5010 board
RAK5010
arm
Intel Corporation
Raptor Lake P CRB
x86
Intel Corporation
Raptor Lake S CRB
x86
Raspberry Pi Foundation
Raspberry Pi 4 Model B (Cortex-A72)
arm64
Raspberry Pi Foundation
Raspberry Pi 5 (Cortex-A76)
arm64
Raspberry Pi Foundation
A picture of the Raspberry Pi Pico board
Raspberry Pi Pico
arm
Raspberry Pi Foundation
A picture of the Raspberry Pi Pico 2 board
Raspberry Pi Pico 2
arm
NXP Semiconductors
RD-RW612-BGA
arm
NXP Semiconductors
A picture of the RDDRONE-FMUK66 board
RDDRONE-FMUK66
arm
SparkFun Electronics
A picture of the RED-V Things Plus board
RED-V Things Plus
riscv
Particle.io
A picture of the Redbear Labs Nano board
Redbear Labs Nano
arm
Particle.io
A picture of the Redbear Labs Nano v2 board
Redbear Labs Nano v2
arm
PHYTEC
A picture of the reel board board
reel board
arm
Renesas Electronics Corporation
A picture of the Renesas Starter Kit for RX130 board
Renesas Starter Kit for RX130
rx
Renesas Electronics Corporation
A picture of the Renesas Starter Kit+ for RZ/N2L board
Renesas Starter Kit+ for RZ/N2L
arm
Renesas Electronics Corporation
A picture of the Renesas Starter Kit+ for RZ/T2L board
Renesas Starter Kit+ for RZ/T2L
arm
Renesas Electronics Corporation
A picture of the Renesas Starter Kit+ for RZ/T2M board
Renesas Starter Kit+ for RZ/T2M
arm
Synopsys, Inc.
RISC-V nSIM and HAPS FPGA boards
riscv
Antmicro's open source simulation and virtual development framework
RISCV32 Virtual
riscv
Ezurio
A picture of the RM1xx DVK board
RM1xx DVK
arm
TDK Corporation.
A picture of the RoboKit 1 board
RoboKit 1
arm
Firefly
ROC-RK3568-PC (Quad-core Cortex-A55)
arm64
Waveshare Electronics
A picture of the RP2040-Plus board
RP2040-Plus
arm
Waveshare Electronics
A picture of the RP2040-Zero board
RP2040-Zero
arm
Realtek Semiconductor Corp.
A picture of the RTS5912 Evaluation Board board
RTS5912 Evaluation Board
arm
Ruuvi Innovations Ltd (Oy)
A picture of the RuuviTag board
RuuviTag
arm
Renesas Electronics Corporation
A picture of the RZ/A2M Evaluation Kit board
RZ/A2M Evaluation Kit
arm
Renesas Electronics Corporation
A picture of the RZ/A3UL SMARC Evaluation Board Kit board
RZ/A3UL SMARC Evaluation Board Kit
arm64
Renesas Electronics Corporation
A picture of the RZ/G2L SMARC Evaluation Board Kit board
RZ/G2L SMARC Evaluation Board Kit
arm
Renesas Electronics Corporation
A picture of the RZ/G2LC SMARC Evaluation Board Kit board
RZ/G2LC SMARC Evaluation Board Kit
arm
Renesas Electronics Corporation
A picture of the RZ/G2UL SMARC Evaluation Board Kit board
RZ/G2UL SMARC Evaluation Board Kit
arm
Renesas Electronics Corporation
A picture of the RZ/G3S SMARC Evaluation Board Kit board
RZ/G3S SMARC Evaluation Board Kit
arm
Renesas Electronics Corporation
A picture of the RZ/V2H Evaluation Board Kit board
RZ/V2H Evaluation Board Kit
arm
Renesas Electronics Corporation
A picture of the RZ/V2L SMARC Evaluation Board Kit board
RZ/V2L SMARC Evaluation Board Kit
arm
Renesas Electronics Corporation
A picture of the RZ/V2N Evaluation Board Kit board
RZ/V2N Evaluation Board Kit
arm
NXP Semiconductors
A picture of the S32K148EVB-Q176 board
S32K148EVB-Q176
arm
Atmel Corporation
A picture of the SAM C21N Xplained Pro Evaluation Kit board
SAM C21N Xplained Pro Evaluation Kit
arm
Atmel Corporation
A picture of the SAM D20 Xplained Pro Evaluation Kit board
SAM D20 Xplained Pro Evaluation Kit
arm
Atmel Corporation
A picture of the SAM D21 Xplained Pro Evaluation Kit board
SAM D21 Xplained Pro Evaluation Kit
arm
Atmel Corporation
A picture of the SAM E54 Xplained Pro Evaluation Kit board
SAM E54 Xplained Pro Evaluation Kit
arm
Atmel Corporation
A picture of the SAM E70(B) Xplained board
SAM E70(B) Xplained
arm
Atmel Corporation
A picture of the SAM L21 Xplained Pro Evaluation Kit board
SAM L21 Xplained Pro Evaluation Kit
arm
Atmel Corporation
A picture of the SAM R21 Xplained Pro Evaluation Kit board
SAM R21 Xplained Pro Evaluation Kit
arm
Atmel Corporation
A picture of the SAM R34 Xplained Pro Evaluation Kit board
SAM R34 Xplained Pro Evaluation Kit
arm
Atmel Corporation
A picture of the SAM V71(B) Xplained Ultra board
SAM V71(B) Xplained Ultra
arm
Atmel Corporation
A picture of the SAM4E Xplained Pro board
SAM4E Xplained Pro
arm
Peregrine Consultoria e Servicos
A picture of the SAM4L WM-400 Cape Board board
SAM4L WM-400 Cape Board
arm
Atmel Corporation
A picture of the SAM4L-EK board
SAM4L-EK
arm
Atmel Corporation
A picture of the SAM4S Xplained board
SAM4S Xplained
arm
Microchip Technology Inc.
A picture of the SAMA7G54 Evaluation Kit board
SAMA7G54 Evaluation Kit
arm
Space Cubics, LLC
A picture of the SC-OBC Module A1 board
SC-OBC Module A1
arm
Analog Devices, Inc.
A picture of the SDP-K1 board
SDP-K1
arm
SECO S.p.A.
A picture of the SECO SBC-3.5-PX30 (JUNO - D23) (STM32F302) board
SECO SBC-3.5-PX30 (JUNO - D23) (STM32F302)
arm
Seeed Technology Co., Ltd
A picture of the Seeeduino XIAO board
Seeeduino XIAO
arm
STMicroelectronics
A picture of the SensorTile.box board
SensorTile.box
arm
STMicroelectronics
A picture of the SensorTile.box PRO board
SensorTile.box PRO
arm
Ezurio
A picture of the Sentrius BT510 Sensor board
Sentrius BT510 Sensor
arm
Ezurio
A picture of the Sentrius BT610 Sensor board
Sentrius BT610 Sensor
arm
Ezurio
A picture of the Sentrius™ MG100 Gateway board
Sentrius™ MG100 Gateway
arm
Silicon Laboratories
A picture of the SiM3U1xx 32-bit MCU USB Development Kit board
SiM3U1xx 32-bit MCU USB Development Kit
arm
Silicon Laboratories
A picture of the SiWx917 Wi-Fi 6 and Bluetooth LE 8 MB Flash + 8 MB ext PSRAM Radio Board (SLWRB4342A) board
SiWx917 Wi-Fi 6 and Bluetooth LE 8 MB Flash + 8 MB ext PSRAM Radio Board (SLWRB4342A)
arm
Silicon Laboratories
A picture of the SiWx917 Wi-Fi 6 and Bluetooth LE SoC 8 MB Flash Radio Board (SLWRB4338A) board
SiWx917 Wi-Fi 6 and Bluetooth LE SoC 8 MB Flash Radio Board (SLWRB4338A)
arm
Texas Instruments
A picture of the SK-AM62 Evaluation board board
SK-AM62 Evaluation board
arm, arm64
Texas Instruments
A picture of the SK-AM64 board
SK-AM64
arm
GARDENA GmbH
A picture of the Smart Garden Radio Module board
Smart Garden Radio Module
arm
STMicroelectronics
A picture of the ST25DV Discovery, MB1283 version board
ST25DV Discovery, MB1283 version
arm
M5Stack
STAMP-C3
riscv
M5Stack
A picture of the StampS3 board
StampS3
xtensa
STMicroelectronics
A picture of the STEVAL STWINBX1 Development kit board
STEVAL STWINBX1 Development kit
arm
STMicroelectronics
A picture of the STM32 Flight Controller Unit board
STM32 Flight Controller Unit
arm
MikroElektronika d.o.o.
A picture of the STM32 M4 Clicker board
STM32 M4 Clicker
arm
Other/Unknown
A picture of the STM32 Mini F401 board
STM32 Mini F401
arm
Other/Unknown
A picture of the STM32 Minimum Development Board board
STM32 Minimum Development Board
arm
96Boards
A picture of the STM32 Sensor Mezzanine board
STM32 Sensor Mezzanine
arm
STMicroelectronics
A picture of the STM3210C Evaluation board
STM3210C Evaluation
arm
STMicroelectronics
A picture of the STM32373C Evaluation board
STM32373C Evaluation
arm
STMicroelectronics
A picture of the STM32C0116-DK Discovery Kit board
STM32C0116-DK Discovery Kit
arm
STMicroelectronics
A picture of the STM32F0 Discovery board
STM32F0 Discovery
arm
Other/Unknown
A picture of the STM32F030 DEMO BOARD board
STM32F030 DEMO BOARD
arm
STMicroelectronics
A picture of the STM32F072 Evaluation board
STM32F072 Evaluation
arm
STMicroelectronics
A picture of the STM32F072B Discovery board
STM32F072B Discovery
arm
Other/Unknown
A picture of the STM32F103 Mini board
STM32F103 Mini
arm
STMicroelectronics
A picture of the STM32F3 Discovery board
STM32F3 Discovery
arm
STMicroelectronics
A picture of the STM32F4 Discovery board
STM32F4 Discovery
arm
WeAct Studio
A picture of the STM32F405 Core Board V1.0 board
STM32F405 Core Board V1.0
arm
STMicroelectronics
A picture of the STM32F411E Discovery board
STM32F411E Discovery
arm
STMicroelectronics
A picture of the STM32F412G Discovery board
STM32F412G Discovery
arm
STMicroelectronics
A picture of the STM32F413H Discovery board
STM32F413H Discovery
arm
STMicroelectronics
A picture of the STM32F429I Discovery board
STM32F429I Discovery
arm
IAR Systems AB
A picture of the STM32F429II-ACA board
STM32F429II-ACA
arm
WeAct Studio
A picture of the STM32F446 Core Board V1.1 board
STM32F446 Core Board V1.1
arm
STMicroelectronics
A picture of the STM32F469I Discovery board
STM32F469I Discovery
arm
STMicroelectronics
A picture of the STM32F723E Discovery board
STM32F723E Discovery
arm
STMicroelectronics
A picture of the STM32F746G Discovery board
STM32F746G Discovery
arm
STMicroelectronics
A picture of the STM32F7508-DK Discovery Kit board
STM32F7508-DK Discovery Kit
arm
STMicroelectronics
A picture of the STM32F769I Discovery board
STM32F769I Discovery
arm
STMicroelectronics
A picture of the STM32G0316 Discovery board
STM32G0316 Discovery
arm
STMicroelectronics
A picture of the STM32G071B Discovery board
STM32G071B Discovery
arm
STMicroelectronics
A picture of the STM32G081B Evaluation board
STM32G081B Evaluation
arm
WeAct Studio
STM32G431 Core Board
arm
WeAct Studio
STM32H5 Core Board
arm
STMicroelectronics
A picture of the STM32H573I-DK Discovery board
STM32H573I-DK Discovery
arm
STMicroelectronics
A picture of the STM32H735G Discovery board
STM32H735G Discovery
arm
STMicroelectronics
A picture of the STM32H745I Discovery board
STM32H745I Discovery
arm
STMicroelectronics
A picture of the STM32H747I Discovery board
STM32H747I Discovery
arm
STMicroelectronics
A picture of the STM32H750B Discovery Kit board
STM32H750B Discovery Kit
arm
STMicroelectronics
A picture of the STM32H757I Eval board
STM32H757I Eval
arm
STMicroelectronics
A picture of the STM32H7B3I Discovery kit board
STM32H7B3I Discovery kit
arm
STMicroelectronics
A picture of the STM32H7S78-DK Discovery board
STM32H7S78-DK Discovery
arm
STMicroelectronics
A picture of the STM32L1 Discovery board
STM32L1 Discovery
arm
STMicroelectronics
A picture of the STM32L152C Discovery board
STM32L152C Discovery
arm
Alientek
A picture of the STM32L475 Pandora board
STM32L475 Pandora
arm
STMicroelectronics
A picture of the STM32L476G Discovery board
STM32L476G Discovery
arm
STMicroelectronics
A picture of the STM32L496G Discovery board
STM32L496G Discovery
arm
STMicroelectronics
A picture of the STM32L4R9I Discovery board
STM32L4R9I Discovery
arm
STMicroelectronics
A picture of the STM32L562E-DK Discovery board
STM32L562E-DK Discovery
arm
STMicroelectronics
A picture of the STM32MP135F-DK Discovery board
STM32MP135F-DK Discovery
arm
STMicroelectronics
A picture of the STM32MP157C-DK2 Discovery board
STM32MP157C-DK2 Discovery
arm
STMicroelectronics
A picture of the STM32MP257F-EV1 Evaluation Board board
STM32MP257F-EV1 Evaluation Board
arm
STMicroelectronics
A picture of the STM32N6570-DK board
STM32N6570-DK
arm
STMicroelectronics
A picture of the STM32U083C-DK board
STM32U083C-DK
arm
STMicroelectronics
A picture of the STM32U5A9J Discovery Kit board
STM32U5A9J Discovery Kit
arm
STMicroelectronics
A picture of the STM32U5G9J Discovery Kit board
STM32U5G9J Discovery Kit
arm
STMicroelectronics
A picture of the STM32U5G9J Discovery Kit 1 board
STM32U5G9J Discovery Kit 1
arm
STMicroelectronics
A picture of the STM32VL Discovery board
STM32VL Discovery
arm
STMicroelectronics
A picture of the STM32WB5MM-DK board
STM32WB5MM-DK
arm
STMicroelectronics
A picture of the STM32WB5MMG board
STM32WB5MMG
arm
Blues Wireless
A picture of the Swan board
Swan
arm
Shenzhen FeiKaiTe Technology Co., Ltd.
A picture of the SwiftIO board
SwiftIO
arm
Shenzhen FeiKaiTe Technology Co., Ltd.
A picture of the SwiftIO Feather board
SwiftIO Feather
arm
Lilygo Shenzhen Xinyuan Electronic Technology Co., Ltd
A picture of the T-Dongle S3 board
T-Dongle S3
xtensa
Lilygo Shenzhen Xinyuan Electronic Technology Co., Ltd
A picture of the T-Watch S3 board
T-Watch S3
xtensa
PJRC
A picture of the Teensy 4.0 board
Teensy 4.0
arm
PJRC
A picture of the Teensy 4.1 board
Teensy 4.1
arm
PJRC
A picture of the Teensy MicroMod board
Teensy MicroMod
arm
SparkFun Electronics
A picture of the Thing Plus Matter board
Thing Plus Matter
arm
Nordic Semiconductor
A picture of the Thingy:52 board
Thingy:52
arm
Nordic Semiconductor
A picture of the Thingy:53 board
Thingy:53
arm
Texas Instruments
A picture of the TI AM243x-EVM board
TI AM243x-EVM
arm
Efinix Inc
A picture of the Titanium Ti60 F225 board
Titanium Ti60 F225
riscv
Telink Semiconductor
A picture of the TLSR9518ADK80D board
TLSR9518ADK80D
riscv
Adafruit Industries, LLC
A picture of the Trinket M0 board
Trinket M0
arm
Lilygo Shenzhen Xinyuan Electronic Technology Co., Ltd
A picture of the TTGO LoRa32 board
TTGO LoRa32
xtensa
Lilygo Shenzhen Xinyuan Electronic Technology Co., Ltd
A picture of the TTGO T-OI-PLUS board
TTGO T-OI-PLUS
riscv
Lilygo Shenzhen Xinyuan Electronic Technology Co., Ltd
A picture of the TTGO T7 Mini32 V1.5 board
TTGO T7 Mini32 V1.5
xtensa
Lilygo Shenzhen Xinyuan Electronic Technology Co., Ltd
A picture of the TTGO T8-C3 board
TTGO T8-C3
riscv
Lilygo Shenzhen Xinyuan Electronic Technology Co., Ltd
A picture of the TTGO T8-S3 board
TTGO T8-S3
xtensa
Lilygo Shenzhen Xinyuan Electronic Technology Co., Ltd
A picture of the TTGO TBeam board
TTGO TBeam
xtensa
Google, Inc.
Twinkie V2
arm
NXP Semiconductors
A picture of the TWR-KE18F board
TWR-KE18F
arm
NXP Semiconductors
A picture of the TWR-KV58F220M board
TWR-KV58F220M
arm
Shenzhen Fuyuansheng Electronic Technology Co., Ltd.
A picture of the UCAN board
UCAN
arm
NXP Semiconductors
A picture of the UCANS32K1SIC board
UCANS32K1SIC
arm
UP Bridge the Gap
A picture of the UP Squared board
UP Squared
x86
UP Bridge the Gap
UP Squared Pro 7000
x86
Microchip Technology Inc.
A picture of the UPD301C Basic Sink Application Example board
UPD301C Basic Sink Application Example
arm
NXP Semiconductors
USB-KW24D512
arm
WeAct Studio
A picture of the USB2CANFDV1 board
USB2CANFDV1
arm
ARM Ltd.
A picture of the V2M Beetle board
V2M Beetle
arm
ARM Ltd.
A picture of the V2M MPS2 board
V2M MPS2
arm
ARM Ltd.
A picture of the V2M Musca B1 board
V2M Musca B1
arm
ARM Ltd.
A picture of the V2M Musca-S1 board
V2M Musca-S1
arm
Variscite Ltd.
A picture of the VAR-SOM-MX8M-PLUS board
VAR-SOM-MX8M-PLUS
arm, arm64
Variscite Ltd.
A picture of the VAR-SOM-MX93 board
VAR-SOM-MX93
arm, arm64
Toradex AG
A picture of the Verdin iMX8M Mini board
Verdin iMX8M Mini
arm
Toradex AG
A picture of the Verdin iMX8M Plus SoM board
Verdin iMX8M Plus SoM
arm
Advanced Micro Devices (AMD), Inc.
Versal 2 RPU development board
arm
Advanced Micro Devices (AMD), Inc.
Versal NET RPU development board
arm
StarFive Technology Co. Ltd.
A picture of the VisionFive 2 JH7110 board
VisionFive 2 JH7110
riscv
NXP Semiconductors
A picture of the VMU RT1170 board
VMU RT1170
arm
WIZnet Co., Ltd.
A picture of the W5500-EVB-Pico board
W5500-EVB-Pico
arm
WIZnet Co., Ltd.
A picture of the W5500-EVB-Pico2 board
W5500-EVB-Pico2
arm
DPTechnics
A picture of the Walter board
Walter
xtensa
Element14 (A Premier Farnell Company)
A picture of the WaRP7 - Next Generation IoT and Wearable Development Platform board
WaRP7 - Next Generation IoT and Wearable Development Platform
arm
WinChipHead
A picture of the WCH CH32V003EVT board
WCH CH32V003EVT
riscv
WinChipHead
A picture of the WCH CH32V003F4P6 Development Board board
WCH CH32V003F4P6 Development Board
riscv
WinChipHead
A picture of the WCH CH32V006EVT board
WCH CH32V006EVT
riscv
WinChipHead
A picture of the WCH CH32V303VCT6_EVT board
WCH CH32V303VCT6_EVT
riscv
WinChipHead
A picture of the WCH LinkW board
WCH LinkW
riscv
Silicon Laboratories
A picture of the WGM160P Wi-Fi Module (SLWRB4321A) board
WGM160P Wi-Fi Module (SLWRB4321A)
arm
Chengdu Heltec Automation Technology Co., Ltd.
WiFi LoRa 32 (V2)
xtensa
Seeed Technology Co., Ltd
A picture of the Wio Terminal board
Wio Terminal
arm
Chengdu Heltec Automation Technology Co., Ltd.
A picture of the Wireless Stick Lite (V3) board
Wireless Stick Lite (V3)
xtensa
96Boards
A picture of the WisTrio board
WisTrio
arm
NXP Semiconductors
X-S32Z27X-DC (DC2)
arm
Particle.io
A picture of the Xenon board
Xenon
arm
Seeed Technology Co., Ltd
A picture of the XIAO BLE (Sense) board
XIAO BLE (Sense)
arm
Seeed Technology Co., Ltd
A picture of the XIAO ESP32C3 board
XIAO ESP32C3
riscv
Seeed Technology Co., Ltd
A picture of the XIAO ESP32C6 board
XIAO ESP32C6
riscv
Seeed Technology Co., Ltd
A picture of the XIAO ESP32S3 board
XIAO ESP32S3
xtensa
Seeed Technology Co., Ltd
A picture of the XIAO MG24 board
XIAO MG24
arm
Seeed Technology Co., Ltd
A picture of the XIAO RA4M1 board
XIAO RA4M1
arm
Seeed Technology Co., Ltd
A picture of the XIAO RP2040 board
XIAO RP2040
arm
Infineon Technologies
A picture of the XMC45-RELAX-KIT board
XMC45-RELAX-KIT
arm
Infineon Technologies
A picture of the XMC47-RELAX-KIT board
XMC47-RELAX-KIT
arm
Infineon Technologies
A picture of the XMC7200 Evaluation Kit board
XMC7200 Evaluation Kit
arm
Cadence Design Systems Inc.
A picture of the Xtensa simulator board
Xtensa simulator
xtensa
VCC-GND Studio
A picture of the YD-ESP32 board
YD-ESP32
xtensa
VCC-GND Studio
A picture of the YD-STM32H750VB board
YD-STM32H750VB
arm
Shenzhen Holyiot Technology Co., Ltd.
A picture of the YJ-16019 board
YJ-16019
arm
Digilent, Inc.
A picture of the Zybo board
Zybo
arm
Other/Unknown
A picture of the ABRobot ESP32C3 OLED Shield shield
ABRobot ESP32C3 OLED Shield
MikroElektronika d.o.o.
A picture of the ACCEL 13 Click shield
ACCEL 13 Click
Analog Devices, Inc.
A picture of the AD4052 Evaluation Shield shield
AD4052 Evaluation Shield
Adafruit Industries, LLC
Adafruit 160x128 1.8" SPI TFT display
Adafruit Industries, LLC
Adafruit 2.8" TFT Touch Shield V2 (Nano)
Adafruit Industries, LLC
Adafruit 2.8" TFT Touch Shield V2 (Uno)
Adafruit Industries, LLC
A picture of the Adafruit Adalogger FeatherWing shield
Adafruit Adalogger FeatherWing
Adafruit Industries, LLC
A picture of the Adafruit AW9523 GPIO Expander and LED Driver shield
Adafruit AW9523 GPIO Expander and LED Driver
Adafruit Industries, LLC
A picture of the Adafruit Data Logger Shield shield
Adafruit Data Logger Shield
Adafruit Industries, LLC
A picture of the Adafruit NeoPixel Grid BFF shield
Adafruit NeoPixel Grid BFF
Adafruit Industries, LLC
A picture of the Adafruit NeoPixel Grid BFF (with display matrix) shield
Adafruit NeoPixel Grid BFF (with display matrix)
Adafruit Industries, LLC
Adafruit PCA9685 PWM Shield
Adafruit Industries, LLC
Adafruit WINC1500 WiFi Shield
MikroElektronika d.o.o.
A picture of the ADC Click shield
ADC Click
Analog Devices, Inc.
A picture of the ADXL362 Evaluation Shield shield
ADXL362 Evaluation Shield
Analog Devices, Inc.
A picture of the ADXL367 Evaluation Shield shield
ADXL367 Evaluation Shield
Analog Devices, Inc.
A picture of the ADXL372 Evaluation Shield shield
ADXL372 Evaluation Shield
WIZnet Co., Ltd.
Arceli ETH W5500 Shield
Arduino
A picture of the Arduino GIGA Display Shield shield
Arduino GIGA Display Shield
Arduino
A picture of the Arduino Modulino Buttons shield
Arduino Modulino Buttons
Arduino
A picture of the Arduino Modulino SmartLEDs shield
Arduino Modulino SmartLEDs
Arduino
Arduino UNO Click
ARM Ltd.
A picture of the ARM V2C-DAPLink for DesignStart FPGA shield
ARM V2C-DAPLink for DesignStart FPGA
ARM Ltd.
A picture of the ARM V2C-DAPLink for DesignStart FPGA (boot from QSPI) shield
ARM V2C-DAPLink for DesignStart FPGA (boot from QSPI)
Atmel Corporation
A picture of the Atmel AT86RF2XX Transceiver shield
Atmel AT86RF2XX Transceiver
Atmel Corporation
A picture of the Atmel AT86RF2XX Transceiver for Arduino shield
Atmel AT86RF2XX Transceiver for Arduino
Atmel Corporation
A picture of the Atmel AT86RF2XX Transceiver for Atmel Xplained shield
Atmel AT86RF2XX Transceiver for Atmel Xplained
Atmel Corporation
A picture of the Atmel AT86RF2XX Transceiver for Atmel Xplained (legacy) shield
Atmel AT86RF2XX Transceiver for Atmel Xplained (legacy)
Atmel Corporation
A picture of the Atmel AT86RF2XX Transceiver for Atmel Xplained Pro shield
Atmel AT86RF2XX Transceiver for Atmel Xplained Pro
Atmel Corporation
A picture of the Atmel AT86RF2XX Transceiver for MikroBUS shield
Atmel AT86RF2XX Transceiver for MikroBUS
MikroElektronika d.o.o.
A picture of the BLE TINY Click shield
BLE TINY Click
Texas Instruments
BOOSTXL-ULPSENSE
Texas Instruments
BP-BASSENSORSMKII
Dalian Good Display Co., Ltd.
BuyDisplay 2.8" TFT Touch Shield
Dalian Good Display Co., Ltd.
BuyDisplay 3.5" TFT Touch Shield
MikroElektronika d.o.o.
A picture of the CAN FD 6 Click shield
CAN FD 6 Click
DFRobot
A picture of the CAN-BUS Shield V2 shield
CAN-BUS Shield V2
Texas Instruments
A picture of the DAC80508 Evaluation Module shield
DAC80508 Evaluation Module
Digilent, Inc.
Digilent Pmod ACL
OmniVision Technologies Inc.
DVP 20-pin OV7670 Camera Shield
Aptina Imaging
DVP FPC-24 MT9M114 Camera Module
Espressif Systems
A picture of the ESP-8266 Module shield
ESP-8266 Module
Espressif Systems
A picture of the ESP-8266 Module (Arduino) shield
ESP-8266 Module (Arduino)
Espressif Systems
A picture of the ESP-8266 Module (MikroBus) shield
ESP-8266 Module (MikroBus)
MikroElektronika d.o.o.
ETH Click
MikroElektronika d.o.o.
A picture of the ETH3 Click shield
ETH3 Click
Seeed Technology Co., Ltd
A picture of the Expansion Board Base for XIAO shield
Expansion Board Base for XIAO
NXP Semiconductors
A picture of the FRDM-CR20A shield
FRDM-CR20A
NXP Semiconductors
FRDM-KW41Z
NXP Semiconductors
A picture of the FRDM-ST BC-AGM01 shield
FRDM-ST BC-AGM01
Future Technology Devices International Ltd.
A picture of the FTDI VM800C Display Shield shield
FTDI VM800C Display Shield
BOE Technology Group Co., Ltd.
G1120B0 MIPI Display Shield
Inventek Systems
A picture of the Inventek es-WIFI Mini Shield (UART) shield
Inventek es-WIFI Mini Shield (UART)
Inventek Systems
A picture of the Inventek es-WIFI Shield (generic) shield
Inventek es-WIFI Shield (generic)
Inventek Systems
A picture of the Inventek es-WIFI Shield (SPI) shield
Inventek es-WIFI Shield (SPI)
Other/Unknown
A picture of the Keyestudio CAN-BUS Shield shield
Keyestudio CAN-BUS Shield
PHYTEC
A picture of the link board ETH shield
link board ETH
Texas Instruments
A picture of the LMP90100 Sensor AFE Evaluation Board shield
LMP90100 Sensor AFE Evaluation Board
MikroElektronika d.o.o.
A picture of the LTE IoT 10 Click shield
LTE IoT 10 Click
M5Stack
A picture of the M5Stack Cardputer shield
M5Stack Cardputer
M5Stack
A picture of the M5Stack-Core2 base shield shield
M5Stack-Core2 base shield
Other/Unknown
MAX7219 8x8 Display shield
MikroElektronika d.o.o.
MikroElektronika MCP2518FD Click shield
Nordic Semiconductor
A picture of the nPM1100 EK shield
nPM1100 EK
Nordic Semiconductor
nPM1300 EK
Nordic Semiconductor
nPM2100 EK
Nordic Semiconductor
A picture of the nPM6001 EK shield
nPM6001 EK
Nordic Semiconductor
A picture of the nRF7002 Evaluation Board Shield shield
nRF7002 Evaluation Board Shield
Nordic Semiconductor
A picture of the nRF7002 Evaluation Board Shield (SR Co-Existence) shield
nRF7002 Evaluation Board Shield (SR Co-Existence)
Nordic Semiconductor
A picture of the nRF7002 Evaluation Kit Shield shield
nRF7002 Evaluation Kit Shield
Nordic Semiconductor
A picture of the nRF7002 Evaluation Kit Shield (nRF7000) shield
nRF7002 Evaluation Kit Shield (nRF7000)
Nordic Semiconductor
A picture of the nRF7002 Evaluation Kit Shield (nRF7001) shield
nRF7002 Evaluation Kit Shield (nRF7001)
Nordic Semiconductor
A picture of the nRF7002 Evaluation Kit Shield (SR Co-Existence) shield
nRF7002 Evaluation Kit Shield (SR Co-Existence)
NXP Semiconductors
A picture of the NXP ADTJA1101-RMII Automotive Ethernet Adapter shield
NXP ADTJA1101-RMII Automotive Ethernet Adapter
NXP Semiconductors
NXP BTB44 OV5640 Camera Module
NXP Semiconductors
NXP LCD_PAR_S035 TFT LCD Module (Parallel)
NXP Semiconductors
NXP LCD_PAR_S035 TFT LCD Module (SPI)
NXP Semiconductors
A picture of the NXP M2 WiFi/BT Shield (Murata 1XK) shield
NXP M2 WiFi/BT Shield (Murata 1XK)
NXP Semiconductors
A picture of the NXP M2 WiFi/BT Shield (Murata 2EL) shield
NXP M2 WiFi/BT Shield (Murata 2EL)
NXP Semiconductors
A picture of the NXP M2 WiFi/BT Shield (Murata 2LL) shield
NXP M2 WiFi/BT Shield (Murata 2LL)
Other/Unknown
OpenThread RCP over Arduino SPI
Other/Unknown
OpenThread RCP over Arduino UART
NXP Semiconductors
A picture of the P3T1755DP Arduino I2C Shield shield
P3T1755DP Arduino I2C Shield
NXP Semiconductors
A picture of the P3T1755DP Arduino I3C Shield shield
P3T1755DP Arduino I3C Shield
Panasonic Corporation
A picture of the Panasonic Grid-EYE Evaluation Kit shield
Panasonic Grid-EYE Evaluation Kit
Panasonic Corporation
A picture of the Panasonic Grid-EYE Evaluation Shield shield
Panasonic Grid-EYE Evaluation Shield
Adafruit Industries, LLC
A picture of the PiCowbell CAN Bus for Pico shield
PiCowbell CAN Bus for Pico
Digilent, Inc.
A picture of the Pmod SD Card Shield shield
Pmod SD Card Shield
Other/Unknown
A picture of the Raspberry Pi Pico to UNO FlexyPin Adapter shield
Raspberry Pi Pico to UNO FlexyPin Adapter
Reyax Technology Co., Ltd.
Reyax LoRa RYLR896 and RYLR915 Modules
NXP Semiconductors
RK043FN02H-CT 4.3" LCD Panel
NXP Semiconductors
RK043FN66HS-CTG 4.3" LCD Panel
NXP Semiconductors
RK055HDMIPI4M 5.5" LCD Panel
NXP Semiconductors
RK055HDMIPI4MA0 5.5" LCD Panel
Seeed Technology Co., Ltd
A picture of the Round Display for XIAO shield
Round Display for XIAO
Renesas Electronics Corporation
RTK7EKA6M3B00001BU Display
Renesas Electronics Corporation
RTKLCDPAR1S00001BE Display
Renesas Electronics Corporation
RTKMIPILCDB00000BE MIPI Display
Semtech Corporation
Semtech SX1262MB2DAS LoRa Shield
Other/Unknown
SH1106 128x64 pixels generic shield
Sharp Corporation
Sharp memory display generic shield
SparkFun Electronics
A picture of the SparkFun MicroMod Asset Tracker Shield shield
SparkFun MicroMod Asset Tracker Shield
SparkFun Electronics
Sparkfun Sara R4
SparkFun Electronics
SparkFun USB Host Shield
Other/Unknown
SSD1306 128x32 pixels generic shield
Other/Unknown
SSD1306 128x64 pixels generic shield
Other/Unknown
SSD1306 128x64 pixels generic shield (SPI)
STMicroelectronics
A picture of the ST B-CAMS-IMX-MB1854 shield
ST B-CAMS-IMX-MB1854
STMicroelectronics
A picture of the ST B-CAMS-OMV MB1683 Camera Shield shield
ST B-CAMS-OMV MB1683 Camera Shield
STMicroelectronics
A picture of the ST B-LCD40-DSI1 shield
ST B-LCD40-DSI1
STMicroelectronics
A picture of the ST B-LCD40-DSI1 (MB1166-A09) shield
ST B-LCD40-DSI1 (MB1166-A09)
STMicroelectronics
A picture of the ST MB1897 camera module shield
ST MB1897 camera module
STMicroelectronics
ST STM32F4DIS-CAM
Other/Unknown
ST7789V TL019FQV01
MikroElektronika d.o.o.
A picture of the Stepper 18 Click shield
Stepper 18 Click
MikroElektronika d.o.o.
A picture of the Stepper 19 Click shield
Stepper 19 Click
Semtech Corporation
SX1272MB2DAS LoRa Shield
Semtech Corporation
SX1276MB1MAS LoRa Shield
Texas Instruments
A picture of the Texas Instruments TCAN4550EVM shield
Texas Instruments TCAN4550EVM
Renesas Electronics Corporation
A picture of the US159-DA14531EVZ Pmod shield
US159-DA14531EVZ Pmod
Seeed Technology Co., Ltd
A picture of the W5500 Ethernet Shield shield
W5500 Ethernet Shield
Waveshare Electronics
Waveshare 240x240 1.3inch IPS LCD
Waveshare Electronics
WAVESHARE e-Paper GDEH0154A07
Waveshare Electronics
WAVESHARE e-Paper GDEH0213B1
Waveshare Electronics
WAVESHARE e-Paper GDEH0213B72
Waveshare Electronics
WAVESHARE e-Paper GDEH029A1
Waveshare Electronics
WAVESHARE e-Paper GDEW042T2
Waveshare Electronics
WAVESHARE e-Paper GDEW042T2-P
Waveshare Electronics
WAVESHARE e-Paper GDEW075T7
Waveshare Electronics
WAVESHARE e-Paper GDEY0213B74
Waveshare Electronics
Waveshare Pico OLED 1.3"
Waveshare Electronics
A picture of the Waveshare Pico UPS-B shield shield
Waveshare Pico UPS-B shield
WeAct Studio
A picture of the WeAct OV2640 Camera Module Shield shield
WeAct OV2640 Camera Module Shield
MikroElektronika d.o.o.
A picture of the Weather Click (I2C) shield
Weather Click (I2C)
MikroElektronika d.o.o.
A picture of the Weather Click (SPI) shield
Weather Click (SPI)
MikroElektronika d.o.o.
A picture of the WIFI BLE Click (Arduino) shield
WIFI BLE Click (Arduino)
MikroElektronika d.o.o.
A picture of the WIFI BLE Click (MikroBus) shield
WIFI BLE Click (MikroBus)
Wistron NeWeb Corporation
Wnc M14A2A
STMicroelectronics
A picture of the X-NUCLEO-53L0A1 shield
X-NUCLEO-53L0A1
STMicroelectronics
A picture of the X-NUCLEO-BNRG2A1 shield
X-NUCLEO-BNRG2A1
STMicroelectronics
A picture of the X-NUCLEO-EEPRMA2 shield
X-NUCLEO-EEPRMA2
STMicroelectronics
A picture of the X-NUCLEO-GFX01M2 Display Shield shield
X-NUCLEO-GFX01M2 Display Shield
STMicroelectronics
A picture of the X-NUCLEO-IDB05A1 shield
X-NUCLEO-IDB05A1
STMicroelectronics
A picture of the X-NUCLEO-IKS01A1 shield
X-NUCLEO-IKS01A1
STMicroelectronics
A picture of the X-NUCLEO-IKS01A2 (SensorHub / Mode 2) shield
X-NUCLEO-IKS01A2 (SensorHub / Mode 2)
STMicroelectronics
A picture of the X-NUCLEO-IKS01A2 (Standard / Mode 1) shield
X-NUCLEO-IKS01A2 (Standard / Mode 1)
STMicroelectronics
A picture of the X-NUCLEO-IKS01A3 (SensorHub / Mode 2) shield
X-NUCLEO-IKS01A3 (SensorHub / Mode 2)
STMicroelectronics
A picture of the X-NUCLEO-IKS01A3 (Standard / Mode 1) shield
X-NUCLEO-IKS01A3 (Standard / Mode 1)
STMicroelectronics
A picture of the X-NUCLEO-IKS02A1 (Microphone) shield
X-NUCLEO-IKS02A1 (Microphone)
STMicroelectronics
A picture of the X-NUCLEO-IKS02A1 (SensorHub / Mode 2) shield
X-NUCLEO-IKS02A1 (SensorHub / Mode 2)
STMicroelectronics
A picture of the X-NUCLEO-IKS02A1 (Standard / Mode 1) shield
X-NUCLEO-IKS02A1 (Standard / Mode 1)
STMicroelectronics
A picture of the X-NUCLEO-IKS4A1 (Mode 1) shield
X-NUCLEO-IKS4A1 (Mode 1)
STMicroelectronics
A picture of the X-NUCLEO-IKS4A1 (Mode 2) shield
X-NUCLEO-IKS4A1 (Mode 2)
STMicroelectronics
A picture of the X-NUCLEO-IKS4A1 (Mode 3) shield
X-NUCLEO-IKS4A1 (Mode 3)
STMicroelectronics
A picture of the X-NUCLEO-WB05KN1 (SPI) shield
X-NUCLEO-WB05KN1 (SPI)
STMicroelectronics
A picture of the X-NUCLEO-WB05KN1 (UART) shield
X-NUCLEO-WB05KN1 (UART)